How long does the build process take?

Construction on site for the average Swedish home is between 10 and 16 weeks from first dig to the last brush stroke!
The actual build time on site is very rapid due to our level of prefabrication, with all triple glazed windows and external doors factory fitted and with all the wall insulation built in.
The foundations are being built at the same time as we are manufacturing your house package so this shortens site time by several weeks.
With our team of specialist Swedish erectors your timber frame structure will be erected within 4 to 8 days depending on size and complexity of your design. The remainder of work to complete your build will normally be in the region of a further 8-10 weeks